SUPPLY
AND FIT

IF YOU WISH TO
PROCEED WITH
OUR QUOTATION…
If you decide to progress with the order, please get in touch and we will send you a pro-forma invoice with payment stages as per agreed terms and conditions.
We will then discuss current lead times and arrange the next step – site survey.
DEPOSIT PAYMENT
AND SIGNED TERMS
AND CONDITIONS
1ST STEP
PLEASE NOTE
we will require the first deposit payment in order to carry out site survey and begin detailed design drawings. Please ensure deposits are paid on time to avoid any delays to the programme.
We will carry out a manual or digital survey, liaise with the builder with regards to connections and weathering details and check the access and best possible ways of installation.
SITE SURVEY AND
ESTABLISHING ACCESS
2ND STEP
PLEASE NOTE
before asking us to proceed with the survey, please make sure all structural openings are ready to measure or sizes can be agreed with the builder on site. Any extra or wasted visits can chargable.
If you, the architect or your builder require drawings prior to creating the openings, then we will move to the next stage – technical drawings, before commencing the survey.
If a survey is not required and we can work to agreed sizes, then we will proceed with technical drawings.
A
C
B
Please allow up to two weeks for design approval drawings to be issued. Depending on complexity and number of current projects at the time of order, lead time might be extended. We will advise on a lead time after the site survey.
TECHNICAL DRAWINGS
3RD STEP
If design in principal is agreed and drawings are approved, we will move to the next step.
TECHNICAL DRAWING APPROVAL/
COMMENTS AND REVISIONS
4TH STEP
If you would like to make any changes please allow up to five working days to issue new revised drawings.
If the drawings and sizes are subject to site survey please allow up to five working days to issue new drawings with revised sizes.
A
C
B
With the approval of design and connection details we will prepare fabrication drawings for each project element.

Usually it takes up to three days, depending on number of elements and the size of the project.

When all drawings are ready and checked we will start manufacture of all the materials.
FABRICATION DRAWINGS AND
PROCUREMENT PROCESS
5TH STEP
SECOND DEPOSIT
STAGE PAYMENT AND PRODUCTION
LEAD TIMES
6TH STEP
Following the production process, we will be able to advise on a lead time for production and an exact date for installation.
PLEASE NOTE
production will start only when your deposit is received. Please arrange for a prompt payment to avoid delays.
Every installation date and its duration period will be agreed with the client and builder.
INSTALLATION
7TH STEP
THE PROJECT IS COMPLETE AND
YOU CAN ENJOY THE VIEW.
8TH STEP
PLEASE NOTE
the above durations are not necessarily consecutive in order and some durations may overlap. If required a more detailed program can be produced upon receipt of client's program and confirmation of anticipated start date. These durations are target/projected dates only and do not form part of a contract, as durations may change subject to current project commitments.
TO ARCHITECTS
TECHNICAL DRAWINGS
NONE CAN BETTER THAN YOU UNDERSTAND AND APPRECIATE THE WELL DONE WORK. WE PRODUCE WINDOWS AND DOORS FOR INDIVIDUAL ORDES EVERYDAY. WE ARE NOTAFRAID IN OUR WORK OF CHALLENGES, DIFFICULT, 0R TOTALLY INNO VATIVE THEMES.
WE LIKE TO WORK WITH ARCHITECTS!
We invite Architects and Interior Designers to cooperate with us. Why is it worth to do?

•‎ Easy access to 2D and 3D details, catalogues, material samples and product colours,

•‎ Our full commitment and individual approach in the implementation of your project – both in the selection of materials and colours, as well as the creation of the offer, production, delivery and assembly,

•‎ Our office and production department are open to your visit.